Forum Iris & Bulbes
Invité : :
Dim 06 Fév 2022, 3:15
No Extra Errors With Process Safety Management
The Florida Department of Education (FLDOE) accredited and funded ($1.2 million/year) a 5-12 months challenge in spring, 2006, to implement the problemsolving/ response-to-intervention (PSM/RTI) mannequin all through the state. The mission was awarded to the college Psychology Program on the University of South Florida. However, constructing the infrastructure necessary to implement the PSM/RTI mannequin actually began in 1991, and the state systematically constructed capability to assist the implementation of this model. This chapter describes how the state built capacity to implement the PSM/RTI mannequin, the three-stage implementation process, the training model, the implementation plan and the analysis protocol.
Toutes les heures sont au format GMT + 2 Heures
Page 1 sur 1
|
|
Voir le sujet précédent ::
Voir le sujet suivant
Vous pouvez poster de nouveaux sujets dans ce forum Vous pouvez répondre aux sujets dans ce forum Vous ne pouvez pas éditer vos messages dans ce forum Vous ne pouvez pas supprimer vos messages dans ce forum Vous ne pouvez pas voter dans les sondages de ce forum
|
top
Société Française des Iris et plantes Bulbeuses (S.F.I.B.)
BP 16, 78354 Jouy-en-Josas cedex, France.